ASME – Use of HDPE for Power Plant Piping Systems Workshop, June 7-10, 2010

Filed under: News.

June 7–10, 2010 • Charlotte, NC

One Workshop. Three Days. 20+ Experts.

The Use of HDPE for Power Plant Piping Systems Workshop covers the design, fabrication, and installation of HDPE piping systems, including testing, repair and regulatory issues and concerns. Case studies will be presented on the installation and use of HDPE at Ameren Corporation’s Callaway Plant tentative in Missouri and Duke Energy Corporation’s Catawba Nuclear Station in South Carolina.

Visit Evisive’s exhibit at the workshop.  

http://events.asme.org/HDPE/home.cfm

Publications

Presentation

We have released several documents giving insight to our technologies and processes.

International

International

We provide our technology worldwide and have worked on many overseas operations.

Immense Networks